Extraordinary General Meeting Minutes — 15 January 2026

Available in: en es
This is a translation. The Spanish version is the legally authoritative document. View original
Date
15 January 2026
Type
EGM Minutes
Issued by
Adenjo Gestión SL
Buildings affected
All buildings
Translation status
Machine translation — Spanish original is the legal document

Owner-prepared summary. Original document is the authoritative source.

At a glance

  • Extraordinary General Meeting held on 15 January 2026 at second call.
  • Approval of the construction contract for façade rehabilitation with the selected company.
  • Approval of the collective loan for supplementary financing.
  • Appointment of the technical architect as project manager.

Key decisions

  1. 1. Façade rehabilitation contract approved: 183 in favour, 10 against, 3 abstentions.
  2. 2. Collective loan of €500,000 over 10 years approved: 179 in favour, 15 against, 2 abstentions.
  3. 3. Appointment of project manager approved unanimously (196 votes).

Vote breakdown

Motion In favour Against Abstain
Façade rehabilitation contract 183 10 3
Collective loan €500,000 179 15 2
Appointment of project manager 196 0 0
Download original PDF

acta-jge-enero-2026.pdf · Original language: Spanish

Full document text

Constitution and quorum

The Extraordinary General Meeting was held on 15 January 2026 at second call, with sufficient quorum.

Item 1 — Façade rehabilitation contract

Following presentation of the technical project and the budget from the awarded company, the Meeting approved the signing of the construction contract.

Approved by 183 votes in favour, 10 against, 3 abstentions.

Item 2 — Collective loan

To finance the portion of rehabilitation costs not covered by the ordinary special levy, the Meeting approved the signing of a collective loan of €500,000 over a period of 10 years.

Approved by 179 votes in favour, 15 against, 2 abstentions.

Item 3 — Appointment of project manager

The Meeting appointed the proposed technical architect to carry out the functions of project manager during the execution of the works.

Approved by 196 votes in favour, 0 against, 0 abstentions.

Unofficial translation. The Spanish original is the legal document.